Work on the Jones Pedestrian Bridge on the South Huron Trail is on schedule.
Tim Cumming of the Ausable Bayfield Conservation Authority said there's still a lot work to do as far as footings, abutments and piers before the bridge can be put in place.
The 52-metre steel bridge has already been constructed, and installation should be completed by the end of November.
Cumming added fund-raising is still continuing. $235,000 has already been raised, but they need an additional $65,000.